ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2007, Vol. 27 ›› Issue (增刊): 566-570.DOI: B
• wenzhang • Previous Articles Next Articles
BAI Yun, SHANG Jing, MAO Jian-Min
Received:
Online:
Published:
Abstract:
The application of risk management on the Metro Line No.10 in Shanghai is presented in this paper. The importance, the basic methods and the practical techniques of risk management (risk identification, risk assessment, risk control) are discussed. At last, some suggestions about the future development of risk management in underground engineering are given.
Key words: risk management  , rail traffic underground project  , risk assessment
CLC Number:
 
F4
U459.3 
BAI Yun, SHANG Jing, MAO Jian-Min. Application of Risk Management on Metro Line No.10 in Shanghai[J]. Tunnel Construction, 2007, 27(增刊): 566-570.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2007/V27/I增刊/566