ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2007, Vol. 27 ›› Issue (增刊): 590-592.DOI: B

• wenzhang • Previous Articles     Next Articles

Management of Significant Risk Sources: Case Study on
Mazhou Subsea Tunnel Project

 TUN Fa-Zhan   

  1. The 2nd Engineering Co., Ltd. of China Railway Tunnel Group, Yanjiao 101601, Beijing, China
  • Received:2007-01-16 Revised:2007-03-02 Online:2007-08-10 Published:2010-04-20

Abstract:

 Mazhou utilities tunnel crosses Lingdingyang sea. On basis of the features of the project, the risk sources are identified, analyzed and determined. Furthermore, the risk sources are treated as a fundamental part of the health and safety management of the project. The principle of "safety first and prevention primary" is observed and prevention countermeasures are taken for the significant risk sources so as to guarantee the construction safety.

Key words: subsea tunnel  , significant risk source  , safety management

CLC Number: