Based on the width, the depth and the ground condition of the opencut foundation pit of metro station, the economy, efficiency, security of different lift equipment are discussed, which can provides some suggestions for selection of lift technique in the future similar projects.
CLC Number:
U455
YAN Fa-Rong. Selection of Lift Equipment in Deep and Large Foundation Pit of Metro Station[J]. Tunnel Construction, 2007, 27(增刊): 593-595.