ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2007, Vol. 27 ›› Issue (增刊): 202-207.DOI: B
• wenzhang • Previous Articles Next Articles
SHU Xu, CHEN Dun-Hong, XU Zhong-Yuan
Received:
Online:
Published:
Abstract:
This article describes the DOT shieldtunneling construction method applied to the tunnel underneath the Danshui River on the TTY International Airport MRT line. The construction of this tunnel faced many different conditions, such as steep slopes, sharp turns, riverbed scouring, drift wood, land acquisition, drilling through piles,building protection and passenger excavation etc. We offer various solutions to the abovementioned difficulties based on our experiences. We hope to provide useful information for future designers faced with similar conditionshis.
Key words: DOT , shieldtunnel crosspassage
CLC Number:
U455.43
SHU Xu, CHEN Dun-Hong, XU Zhong-Yuan. The Design Considerations of DOT Tunneling Technology Apply to Taiwan Taoyuan International Airport MRT Line[J]. Tunnel Construction, 2007, 27(增刊): 202-207.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2007/V27/I增刊/202