ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2007, Vol. 27 ›› Issue (增刊): 494-497.DOI: B
• wenzhang • Previous Articles Next Articles
WANG Ning, XUE Chao-Jie
Received:
Revised:
Online:
Published:
Abstract:
The connected aisle between two metro tunnels plays an important role in disaster prevention, draining water and contacting. The artificial ground freezing method has been used to build the connected aisle, and the design, construction technologies and quality control of this method has become a matter of concern. The critical technologies of the artificial ground freezing method in the construction of a connected aisle in Shanghai metro is presented in this paper.
Key words: metro  , connected aisle  , artificial ground freezing method  , control
CLC Number:
U231
TU753.7
WANG Ning, XUE Chao-Jie. Application of Artificial Ground Freezing Method in Construction of Contacted Aisle[J]. Tunnel Construction, 2007, 27(增刊): 494-497.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2007/V27/I增刊/494