Design and Construction of Jingsong Station in Beijing Metro

YANG Guo-Zhu, WANG Hai-Xiang, ZHANG Zhi-Bin   

  1. 1.The First Survey and Design Institute of China Railway, Xi'an 710043;
    2.The Fifth Engineering Group Co., Ltd. of China Railway, Guiyang 550003
  • Received:2007-05-11 Revised:2007-07-05 Online:2007-08-10 Published:2010-04-20

Abstract:

Jingsong station on metro line 10 in Beijing has the complex structure of twocolumn, threearch, twofloor and island platform, which is under bad geological conditions and sensitive buildings. The topdown tunnelcolumn method is used to construct the station. The points of structural design and construction are presented in this paper, which can provide experiences for other similar projects.

Key words: shallow excavation  , topdown tunnelcolumn method structure  , design  , construction