ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2007, Vol. 27 ›› Issue (增刊): 418-423.DOI: B
• wenzhang • Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract:
The 25km long tunnel with the circular crosssection on highspeed railway was constructed by TBM. Based on the characteristics and applications of the belt transportation and rail transportation, the transportation system in the 25km long tunnel was presented in this paper. In this system the track, equipment, train, rockdischarging, transportation organization, concrete transportation, transportation in the passage and the emergency transportation between the two parallel tunnels are elaborated, which provides reference to other similar projects.
Key words: long tunnel TBM construction transportation
CLC Number:
TD263.3+3
 
TD524
TD528+.1
WANG Guo-Xi, CHAI Yong-Mo. Transportation during TBM Construction in a 25km Long Tunnel on Passenger Line[J]. Tunnel Construction, 2007, 27(增刊): 418-423.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2007/V27/I增刊/418