Tunnel Construction ›› 2010, Vol. 30 ›› Issue (1): 48-52,62.DOI: A
• wenzhang • Previous Articles Next Articles
TAO Xian-Li
Received:
Revised:
Online:
Published:
Abstract:
Sleevedrilling pilepulling method is adopted in the construction of Line 2 of Nanjing Metro so as to ensure the safe boring of the shield machines when abandoned piles of surface structures are encountered. The mechanisms of pile pulling construction and the evaluation of different pile pulling methods are presented in the paper. The construction procedures, equipment selection and matching, construction results and problems of sleevedrilling pilepulling method are expatiated. The sleevedrilling pilepulling method focused in the paper is simple in procedures, easy in operation, efficient in construction, good in construction results and costsaving (especially for the case of pulling piles close to utility lines). The method can be widely applied in pulling of smalldiameter (diameter being less than φ1000mm) piles and short (length being less than 27m) piles.
Key words: pile pulling, equipment selection, sleeve drilling method
CLC Number:
U459.3
TAO Xian-Li. Application of Sleevedrilling Pilepulling Method in Line 2 of Nanjing Metro[J]. Tunnel Construction, 2010, 30(1): 48-52,62.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/A
http://www.suidaojs.com/EN/Y2010/V30/I1/48