| [1] |
WU Fan, QI Mengxue, LEI Shengxiang, HUANG Jiangfan, SONG Hongjiao, ZHANG Yuntong, HU Junwei, LI Jucai.
Mucking for TBM Tunneling Using Continuous-Belt Conveyor Technology in Large-Slope Variable-Grade Spiral Tunnels
[J]. Tunnel Construction, 2026, 46(2): 419-429.
|
| [2] |
SUN Yi, YU Hongwei, YE Ming, WU Gensheng, REN Changchun, DU Zhanjun, ZHANG Yunpei, LI Xu, LI Jian.
Intelligent Recognition Methods for Muck Flow Status in Inclined Shaft TBM
[J]. Tunnel Construction, 2025, 45(S2): 214-221.
|
| [3] |
XU Youjun, JIN Chenyu, ZHANG Chao, WANG Nan.
Optimization of Counteracting Soil of Parameters a Deep Foundation Pit Close to an Existing Station in Hohhot, China
[J]. Tunnel Construction, 2025, 45(9): 1728-1741.
|
| [4] |
JIA Lianhui, SUN Heng, ZHANG Xingbin, YU Qingzeng, LI Lei, NING Xiangke.
Crucial Construction
Technology of Tunnel Boring Machines for Constructing Large-Slope Inclined Shaft in Pumped Storage
Power Station
[J]. Tunnel Construction, 2024, 44(8): 1660-1668.
|
| [5] |
YANG Lixin.
Issues Related to Application of Jet Fans in
Partitioned Ventilation of
Tunnel Inclined Shafts
[J]. Tunnel Construction, 2023, 43(S1): 54-60.
|
| [6] |
TIAN Jingwei, WAN Xiaoyan, SHI Xianming.
Effect of Air Extraction From Inclined Shafts in
Tunnels on Overturning Stability of HighSpeed
Trains
[J]. Tunnel Construction, 2023, 43(S1): 233-239.
|
| [7] |
WANG Pengxing, HE Fei, NING Xiangke, SENG Xiongfei.
Research and Application of Key Technologies of Large
Diameter Tunnel Boring Machine with Large Slope and UltraSmall
Turning Radius
[J]. Tunnel Construction, 2023, 43(9): 1614-1622.
|
| [8] |
XU Jianfeng, XU Zhonglin, GUO Chun, YUAN Kun, DONG Haijiang, YANG Xiaobing, YANG Yongpeng, TIAN Ye, CHEN Yuqi.
Characteristics of Carbon Emissions from Excavation
and Supporting During Construction of
Inclined Shafts of Highway Tunnels
[J]. Tunnel Construction, 2023, 43(7): 1146-1152.
|
| [9] |
TANG Jianguo, PENG Zhengyang, ZHANG Xiangfu, REN Xin, YUE Jinwen, ZHOU Fangjian.
Effect of Tunneling Parameters on Mucking Performance
of Tunnel Boring Machine Cutterhead in PumpedStorage Power Station Inclined Shaft
[J]. Tunnel Construction, 2022, 42(S2): 29-35.
|
| [10] |
PEI Zhenzhen, WANG Yanan.
Economic Comparison of Dimension of Inclined Shaft
CrossSection and Ventilation Pipe of DoubleTube Tunnel
[J]. Tunnel Construction, 2022, 42(S2): 213-219.
|
| [11] |
WEN Bin.
Key Technology and Application of Efficient Tunneling
of an Extra-Long Tunnel
Bored by Two Tunnel Boring Machines
[J]. Tunnel Construction, 2022, 42(S1): 433-441.
|
| [12] |
WANG Yue, XU Qipeng, MA Zhaolin.
Practice and Optimization of Grouting Scheme for
Expansion Excavation of Tunnel in Silty Fine Sand Stratum of
Zhengzhou Metro
[J]. Tunnel Construction, 2021, 41(12): 2140-2149.
|
| [13] |
YANG Yang, TANG Ke, GONG Bin, YAN Jian, WANG Bo.
Drainage Technology of Main Tunnel Construction
Assisted by Inclined Shaft in High-Altitude Water-Rich Tunnels: a Case Study on
Extra-Long -Milashan Tunnel of
Nyingchi-Lhasa Highway in Tibet, China
[J]. Tunnel Construction, 2021, 41(12): 2171-2177.
|
| [14] |
LI Jiangao, LIU Yafei.
Study on Comprehensive Cooling Technology for High
Ground Temperature in Long and Large Inclined Shaft of
DaliRuili Railway
[J]. Tunnel Construction, 2020, 40(10): 1498-1505.
|
| [15] |
XU Jinbin, WANG Feng, FU Cong, SONG Wei.
Combined Application of Cement System and Vertical Ground Freezing to Shield Receiving in Wuhan Metro
[J]. Tunnel Construction, 2019, 39(S2): 358-365.
|