Re-active Power Compensation of Temporary Facilities and Lighting of the Tunnel

 LI Shun-Ta   

  1. Guangzhou Municipal Dunjian Underground Construction Engineering Co., Ltd., Guangzhou 510030,China
  • Received:2009-04-01 Revised:2009-04-03 Online:2009-04-15 Published:2010-04-06

Abstract:

During tunnel construction, the equipment and lighting can not work due to great voltage loss and low power factor caused by the fact the line of the power cable and lighting cable laid along the tunnel is too long. To improve this situation, power compensation is adopted to reduce voltage loss with the lowest cost based on the engineering practice. This method has a better effect, especially on the improvement of sever voltage loss upon long distance low voltage power supply. A discussion has also been made on the relationship between power factor and voltage loss, which can be use for reference.

Key words: tunnel construction, long distance power supply, voltage loss, re-active power compensation