| [1] |
SONG Liuzhuo, XIA Qiang, XU Zhengxuan, ZHANG Qiang, HUANG Teng.
Hydrogeological Parameter Inversion Based on Transient Tunnel Inflow Analytical Solution
[J]. Tunnel Construction, 2026, 46(5): 1028-1038.
|
| [2] |
ZHEN Yabin, LEI Han, ZHONG Junbin, JIAO Yaji.
Internal Force Distribution Pattern of Prefabricated
Circular Open Caisson at Different Construction Stages of Internal
Lining
[J]. Tunnel Construction, 2025, 45(S1): 51-60.
|
| [3] |
GUO Defu, ZHANG Jingli, FANG Yuzhong, LYU Peilin, DI Huijie, ZHANG Hao, YANG Chen.
Practice and Innovation of Continuous Caisson Construction Technology for Underground Railway Stations in Jiaxing, China
[J]. Tunnel Construction, 2025, 45(8): 1577-1589.
|
| [4] |
XIAO Jing, ZENG Xutao, LI Jiacheng, CHEN Peishuai, LI Dejie.
Design and Application of a Lateral Friction
Resistance Monitoring
Device for Open Caissons
[J]. Tunnel Construction, 2024, 44(3): 535-542.
|
| [5] |
ZHANG Zhongjie, LYU Peilin, YU Jian, GUO Zhenkun, ZHANG Qingyu, WANG Haoran.
Key Techniques of Constructing Underground Stations Using
Continuous Open Caisson Method
[J]. Tunnel Construction, 2024, 44(3): 554-563.
|
| [6] |
SUN Ruize, LIAO Shaoming, LIU Mengbo, ZHU Jiwen.
InSitu Measurements on End Resistance
of Press-in Caisson in Soft Ground:A Case Study of Wenzhou Caisson-Type
Underground Garage Project
[J]. Tunnel Construction, 2023, 43(S2): 310-320.
|
| [7] |
ZHAO Fei, XU Guangyi, LYU Dan.
Key Technology and Test of Caisson Tunneling Machine
[J]. Tunnel Construction, 2023, 43(S2): 578-586.
|
| [8] |
ZHANG Mingju, WANG Siqing, LI Pengfei, XU Qing.
Analysis of Tunnel Seepage Field Considering Drainage
System
[J]. Tunnel Construction, 2023, 43(S1): 46-53.
|
| [9] |
WANG Xuxiang, LIAN Jiye, MAO Jimin, YANG Xueqiang, SONG Limin.
Research on Three Dimensional Soil Failure Shapes and Settlements Around Shallow Buried Pipe Jacking Caisson
[J]. Tunnel Construction, 2022, 42(S1): 257-266.
|
| [10] |
HUANG Mingliang, ZHANG Zhenguang, XU Jie, JIANG Hong, BAO Heli, LIU Xian.
Measuring of Shaft Wall Stress in Caisson Construction
Process Based on Vertical Shaft Sinking Machine: a Case Study of
CaissonType Underground
Intelligent
Parking Garage Project in Nanjing, China
[J]. Tunnel Construction, 2022, 42(6): 1033-1043.
|
| [11] |
KANG Zengzhu, LUO Xiaoqing, ZHANG Leigang, CHENG Yun, LIU Guanglei.
SelfSinking Open Caisson Construction
Technology for a ShaftType
Underground Garage
[J]. Tunnel Construction, 2022, 42(4): 730-739.
|
| [12] |
XU Guangyi, XIAO Wei, ZHAO Fei, QI Zhichong, LYU Dan, ZHAO Zihui.
Structural Design of a Kind of Caisson Submerged Shaft
Boring Machine
[J]. Tunnel Construction, 2022, 42(1): 145-153.
|
| [13] |
WU Shiyan.
Prediction of Safe Thickness of Water-Insulating Rock
Disks in Tunnels in Karst Areas
[J]. Tunnel Construction, 2021, 41(12): 2083-2092.
|
| [14] |
HE Huagang.
Prediction of Water Inflow in Karst Tunnels Based on Correlation Criterion and RELM Model
[J]. Tunnel Construction, 2019, 39(8): 1262-1269.
|
| [15] |
LI Yutao, ZHANG Bin, SHI Lei, PENG Zhenhua, LI Junyan.
Enlargement Layout of Underground Watersealed Oil Storage Cavern with Vertical Water Curtain System
[J]. Tunnel Construction, 2019, 39(8): 1308-1318.
|