| [1] |
YANG Ping, LI Jinghao, ZHANG Ting.
Application Status and Prospects of Artificial Ground Freezing Technology in China
[J]. Tunnel Construction, 2026, 46(5): 895-918.
|
| [2] |
BAI Qian, LI Zheng, ZHAO Wen, PENG Zhipeng.
Impact of Small Pipe-Roof-Top Slab Method Support Parameters in Metro Stations on Surface Settlement
[J]. Tunnel Construction, 2026, 46(1): 103-112.
|
| [3] |
FANG Qian, YOU Qizhao, WANG Jianchen, WANG Gan, KE Chengjian, RU Zhenhua.
Deformation of Existing Metro Structures Induced by Newly Built Metro Undercrossing: A Case Study of 18 Newly Built Metro Projects in Beijing
[J]. Tunnel Construction, 2025, 45(S2): 125-139.
|
| [4] |
LIU Xiaogang, SONG Yi, GUO Yanhai, YAO Xilei.
Design of Common Structure Section Between Jinan-Binzhou High-Speed Railway Tunnel and Airport
[J]. Tunnel Construction, 2025, 45(S2): 280-288.
|
| [5] |
FU Lei, WU Huiming, HUANG Hongwei, ZHANG Dongming, CHEN Gang, LI Zhanglin.
Settlement Prediction and Construction Parameters
Optimization Induced by Shield Tunneling Based on Random Forest and Multi-Objective Particle Swarm
Optimization Algorithm-Crowding Distance
[J]. Tunnel Construction, 2025, 45(S1): 318-329.
|
| [6] |
RONG Miren, FENG Chao, PANG Yinping, LUO Lanxin, YUAN Ying, GENG Dongyang, ZHENG Yongrui, LI Jiayin.
Metro Settlement Prediction Based on Wavelet Threshold Denoising-Phase Space Reconstruction Data Processing and Grid Search Method-Optimized Support Vector Machine Regression Model
[J]. Tunnel Construction, 2025, 45(11): 2033-2043.
|
| [7] |
YU Guowu, HE Haoshen, ZHAO Teng, LIN Cungang, XIA Bin, LIANG Yu, ZHAO Chenyang.
Large-Scale Model Test Device for Grouting Behind Shield Tunnel Lining and Preliminary Investigation
[J]. Tunnel Construction, 2024, 44(S2): 123-134.
|
| [8] |
WANG Zhiqiang, WANG Jinli, FAN Dongdong, LIU Tianshuang, TAN Yong.
Parameters Analysis of Long-Distance Rectangular Pipe Jacking Underneath Beijing-Hangzhou
Grand Canal
[J]. Tunnel Construction, 2024, 44(S2): 159-167.
|
| [9] |
RUAN Hengfeng, LIANG Rongzhu, KANG Cheng, LI Zhongchao, CAO Shi′an, DING Zhi.
Elaborate Numerical
Modeling of Metro Shield Tunnel Structure Deformation
Induced by Lateral Foundation Pit Excavation
[J]. Tunnel Construction, 2024, 44(S2): 245-255.
|
| [10] |
FENG Shangze, DING Zude, GUO Yongfa, DING Wenyun, LIU Zhengchu, WANG Changyu.
Surface Settlement Pattern
Caused by Excavation of a Cantilever Boring
Machine Under an Airport
[J]. Tunnel Construction, 2024, 44(S2): 319-328.
|
| [11] |
SONG Hongzhuo, JIANG Annan, RUAN Yingying, MIN Qinghua.
Construction Analysis of Water-Rich Tunnels Based on Hoek-Brown Elastoplastic Hydraulic-Mechanical-Damage Coupling Model
[J]. Tunnel Construction, 2024, 44(S2): 342-351.
|
| [12] |
FENG Tianwei, MENG Qingyu, ZHANG Qingbo, MA Zhifu.
Key Design Technology of
Thickly-Filled Open-Cut Tunnel of High-Speed Railway With Highly-Filled and Deeply-Excavated Foundation
[J]. Tunnel Construction, 2024, 44(S2): 406-415.
|
| [13] |
WANG Qingli.
Design and Engineering
Practice of C-Shaped Connecting Gallery for
Frozen Excavation Method in Rich Water Sand Layer
[J]. Tunnel Construction, 2024, 44(S1): 387-395.
|
| [14] |
.
Calculation Method of Long-Term Settlement and Optimal Tunnel Depth of Shield Tunnel in Under-Consolidated Soft Soil Under Static and Dynamic Load
[J]. Tunnel Construction, 2024, 44(9): 1829-1840.
|
| [15] |
YUAN Rui, ZHAO Xiaopeng, LI Pengfei, LI Zhen, MIN Fanlu.
TimeVarying Consolidation of Grout
Prepared by Waste Rock Slag for Grouting Behind Lining and Its Influence on Ground Settlement:
A Case Study of Heyan
Road Yangtze RiverCrossing Shield Tunnel in Nanjing,
China
[J]. Tunnel Construction, 2024, 44(4): 762-770.
|