[1] |
LIU Xu, WU Honggang, GUAN Wei, SUN Hao.
Applicability of Uneven Convergence Mode in Soft Rock
Tunnels
[J]. Tunnel Construction, 2023, 43(S1): 240-247.
|
[2] |
ZHU Yongsheng, CHU Weijiang, WAN Xiangbing, OUYANG Qiuping, HE Wei, WANG Pengfei.
Surrounding Rock Stability Control Methods in Shear
Bands of Underground Powerhouse of Baihetan Hydropower Station
[J]. Tunnel Construction, 2022, 42(1): 48-56.
|
[3] |
ZHANG Yu, YANG Junsheng, ZHU Zhiheng, TANG Zhiyang, CHEN Wei, FU Jinyang.
Study and Application of a Multidimensional
Large Deformation Monitoring Method Based on Image Point Cloud for Primary Support of a Tunnel
[J]. Tunnel Construction, 2021, 41(5): 795-802.
|
[4] |
KONG Qian, YANG Rui.
Influence of Delayed Steel Support on Support System
of Foundation Pits
[J]. Tunnel Construction, 2021, 41(12): 2113-2120.
|
[5] |
LI Yabo, LI Jing.
Design of Lshaped Joint Concrete Lining
Formwork Trolley
[J]. Tunnel Construction, 2020, 40(6): 898-904.
|
[6] |
TAO Liangliang, ZHANG Yimin, LIU Zhenhan, FU Xiaokang, ZHOU Xiaohan, ZENG Yanhua.
Numerical Study on Influence of Ambient Pressure on
Maximum Temperature of Tunnel
Crown without Consideration of Longitudinal Velocity
[J]. Tunnel Construction, 2020, 40(6): 827-832.
|
[7] |
FENG Jimeng, ZENG Sicong, LIU Aiwu, ZHAHG Shufa, ZHANG Junru.
Deformation Control Standards of High-speed Railway Tunnel in Loess by There-bench Method Based on Monitoring Data
[J]. Tunnel Construction, 2020, 40(1): 50-57.
|
[8] |
GAO Qiao, MA Ke, TANG Chun′an, MA Tianhui.
Microseismicity and Stability of Underground Powerhouse at Huanggou Pumpedstorage Power Station Subjected to Excavation
[J]. Tunnel Construction, 2019, 39(5): 775-782.
|
[9] |
JIA Hailong, ZHANG Wenxin, DENG Chuan.
New Quality Control Technology for Tunnel Secondary Lining
[J]. Tunnel Construction, 2019, 39(10): 1704-1711.
|
[10] |
WANG Baiquan.
Research and Application of Automatic Control System of New Intelligent Lining Trolley Construction
[J]. Tunnel Construction, 2019, 39(10): 1728-1736.
|
[11] |
XIAO Guangzhi.
Discussion on Design and Construction Improvement Measures Based on Current Typical Diseases of Railway Tunnel Lining
[J]. Tunnel Construction, 2018, 38(9): 1416-1422.
|
[12] |
TIAN Jia, LI Jinpeng.
Application of Mechanized Construction Method to Large Crosssectional Tunnel with Soft Surrounding Rocks
[J]. Tunnel Construction, 2018, 38(8): 1350-1360.
|
[13] |
WEI Gang, YAO Wangjing, XU Bin, SHI Changjiang, FU Yi, WANG Zhe.
Analysis of Tunnel Crown Top Settlement Induced by Construction of Large Crosssection Shallowburied Mined Tunnels in Soft Soil
[J]. Tunnel Construction, 2018, 38(7): 1123-1130.
|
[14] |
ZHANG Hongkun, WANG Lichuan, LIAN Fasheng, LIU Zhiqiang, WU Jian, GONG Lun, WANG Gang.
Analysis of Causes of Arch Cracks of a Railway Tunnel
[J]. Tunnel Construction, 2018, 38(5): 764-770.
|
[15] |
YANG Jihua, QI Sanhong, GUO Weixin, ZHANG Dangli.
Application of Least Squares Support Vector MachineParticle Swarm Algorithm to Back Analysis of Surrounding Rock Parameters of Underground Powerhouse
[J]. Tunnel Construction, 2018, 38(11): 1800-1806.
|