[1] |
ZHOU Kefa, HUANG Baolong.
Design of Secondary Water Cooling System for Freezing Construction
of Long Tunnels
[J]. Tunnel Construction, 2024, 44(1): 109-115.
|
[2] |
ZHOU Jinzhong, ZHANG Meiqin, FAN Taixing, DU Jinhai.
Key Design Technology of Fire Hydrant System in Urban
Rail Transit
[J]. Tunnel Construction, 2024, 44(1): 139-147.
|
[3] |
GENG Tianshuang, ZHANG Jing, ZHAO Jiling, YANG Ping, HE Wenlong.
Metro Jet System and Horizontal Freezing Construction
at Zhongsheng Station of Nanjing
Metro Line 7 Closely Crossing Underneath an Operation Station
[J]. Tunnel Construction, 2024, 44(1): 172-180.
|
[4] |
XIA Fengyong, SUN Shipeng, YAO Dian, CHI Minghua, DENG Bin.
Precision Control Technology for Gravel Foundation
Leveling in Immersed Tunnel of ShenzhenZhongshan Link
[J]. Tunnel Construction, 2024, 44(1): 181-188.
|
[5] |
ZHANG Mingju, WANG Siqing, LI Pengfei, XU Qing.
Analysis of Tunnel Seepage Field Considering Drainage
System
[J]. Tunnel Construction, 2023, 43(S1): 46-53.
|
[6] |
LI Ping.
Safety BarrierFree Blocking Technology of
Vehicles at Tunnel Entrance Based on Tyndall Effect
[J]. Tunnel Construction, 2023, 43(S1): 131-138.
|
[7] |
REN Zhen, JIA Lianhui, WANG Shaoping, YE Guangpeng, WANG Youzeng.
Slag Discharge Characteristics of Slurry Shield
Circulatory Pipe
in Cobble Stratum
[J]. Tunnel Construction, 2023, 43(S1): 171-177.
|
[8] |
SUN Hao, CAO Shenghui, WU Honggang, ZHANG Kehong, HUANG Xinyu.
Vibration Failure Mode of Tunnel Crossing Landslide
Based on Hilbert′s Marginal Spectrum Theory: A
Case Study of Tunnel Orthogonal Downward Crossing Slide Body
[J]. Tunnel Construction, 2023, 43(S1): 257-270.
|
[9] |
LIU Huaji, SUN Honglin, ZHANG Zhanrong, YOU Minglong, TAN Fei, LI Wei.
Intelligent Identification of SandstoneSandy
Mudstone Interface Based on
Drilling Parameters
[J]. Tunnel Construction, 2023, 43(S1): 304-312.
|
[10] |
YANG Bin, LIU Tianci, LIU Zhichun, LI Ning, DUO Shengjun.
CrossSection Shape Optimization Design of
Railway Tunnel in
Squeezing Rock Based on Deformation Classification
[J]. Tunnel Construction, 2023, 43(S1): 344-355.
|
[11] |
LI Bingtian, MEI Yongbing, LI Shu, REN Yi.
Application Mode of Electric New Energy Mucking
Equipment in Plateau Transportation Tunnels
[J]. Tunnel Construction, 2023, 43(S1): 544-549.
|
[12] |
LYU Minghao, WEI Chenglin, TANG Xinwei.
Application of LargeDiameter
Metro Jet System in Shield Crossing Underground
Passage with Low Clearance: A Case Study of Airport T1~T2 Section on XintangBaiyun AirportGuangzhou North Railway Station of Intercity
Railway in Pearl River Delta
[J]. Tunnel Construction, 2023, 43(S1): 434-442.
|
[13] |
WANG Pengxing, HE Fei, NING Xiangke, SENG Xiongfei.
Research and Application of Key Technologies of Large
Diameter Tunnel Boring Machine with Large Slope and UltraSmall
Turning Radius
[J]. Tunnel Construction, 2023, 43(9): 1614-1622.
|
[14] |
LIU Jishun, CHEN Haijun, ZHANG Juwen.
Ideal Connecting Distance Between Exit of Urban Tunnel
and Road Intersection Based on Running Speed
[J]. Tunnel Construction, 2023, 43(8): 1387-1395.
|
[15] |
SUN Heng, YANG Qing, HUANG Xinmiao, LI Jiehua, ZHANG Yun.
Design and Application of a Real-Time
Monitoring System for Mucking
Temperature of Earth Pressure Balance Shields
[J]. Tunnel Construction, 2023, 43(8): 1396-1403.
|