Overbreak/shortbreak Control Technology for and Cost Analysis on Rock Tunnels Constructed by Drilling and Blasting Method: Case Study on Tunnels on JiujiangRuichang Highway

Expand
  • (1. The Second Engineering Co., Ltd., of CCCC First Harbor Engineering Co., Ltd., Qingdao 266071, Shandong, China; 2. Shandong University, Jinan 250101, China;3. General Contract Branch of CCCC First Harbor Engineering Co., Ltd., Tianjin 300461, China)

Received date: 2012-07-16

  Revised date: 2012-08-03

  Online published: 2012-12-28

Abstract

The stateofart of overbreak/shortbreak in tunneling is presented, the causes for overbreak/shortbreak are analyzed, and the influences of overbreak/shortbreak on the tunneling cost are described, so as to reduce the cost induced by overbreak/shortbreak of rock tunnels constructed by drilling and blasting method and to improve the qualification rate of tunnel excavation. Effective overbreak/shortbreak control technologies are determined on basis of investigations and trials. After these technologies are applied, the average qualification rate in tunnel excavation has been raised from 67.4% to 83.9%, and the economic efficiency has been improved by 49.9%, which demonstrates that the technologies applied are effective. The paper can provide reference for similar projects in the future.

Cite this article

FENG Haibao, JIANG Wande, QU Lili, GUO Qingjie . Overbreak/shortbreak Control Technology for and Cost Analysis on Rock Tunnels Constructed by Drilling and Blasting Method: Case Study on Tunnels on JiujiangRuichang Highway[J]. Tunnel Construction, 2012 , 32(6) : 887 -891 . DOI: 10.3973/j.issn.1672-741X.2012.06.024

Outlines

/

〈 〉