ISSN 2096-4498
CN 44-1745/U
ISSN 2096-4498
CN 44-1745/U
Technologies for Local Semiring Assembly Shield Passing through Intermediate Ventilation Tunnel
Received date: 2012-06-19
Revised date: 2012-09-18
Online published: 2013-02-19
The shield often has to pass through stations and ventilation tunnels in the construction of Metro shieldbored tunnels. There is great difficulty for construction organization and construction technology. The construction organization and technical difficulties and countermeasures of local semiring assembly shield passing through intermediate ventilation tunnel are analyzed. The paper can provide references for similar projects in the future.
XU Yanjun . Technologies for Local Semiring Assembly Shield Passing through Intermediate Ventilation Tunnel[J]. Tunnel Construction, 2012 , 32(增刊1) : 59 -64 . DOI: 10.3973/j.issn.1672-741X.2012.z1.013
/
| 〈 |
|
〉 |