ISSN 2096-4498
CN 44-1745/U
ISSN 2096-4498
CN 44-1745/U
Topdown Construction Technologies for Yitian Metro Station of Shenzhen
Received date: 2012-06-19
Revised date: 2012-09-18
Online published: 2013-02-19
The topdown construction technologies for Yitian Metro station of Shenzhen crossing Fuqiang road are presented. The key construction technologies of topdown construction technology are presented. The advantages and practicability are proved by construction effect and backfeeding. The paper can provide references for similar projects in the future.
ZHANG Jun . Topdown Construction Technologies for Yitian Metro Station of Shenzhen[J]. Tunnel Construction, 2012 , 32(增刊1) : 90 -94 . DOI: 10.3973/j.issn.1672-741X.2012.z1.019
/
| 〈 |
|
〉 |