ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2012, Vol. 32 ›› Issue (增刊1): 90-94.DOI: 10.3973/j.issn.1672-741X.2012.z1.019
Previous Articles Next Articles
ZHANG Jun
Received:
Revised:
Online:
Published:
Abstract:
The topdown construction technologies for Yitian Metro station of Shenzhen crossing Fuqiang road are presented. The key construction technologies of topdown construction technology are presented. The advantages and practicability are proved by construction effect and backfeeding. The paper can provide references for similar projects in the future.
Key words: Metro station, main structure, cotandcover method, topdown method, steel pipe column
ZHANG Jun. Topdown Construction Technologies for Yitian Metro Station of Shenzhen[J]. Tunnel Construction, 2012, 32(增刊1): 90-94.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2012.z1.019
http://www.suidaojs.com/EN/Y2012/V32/I增刊1/90