Construction Technologies for Asymmetricalloaded and Shallowburied  Tunnels with Soft Surrounding Rocks

  • LIU Jun
Expand
  • (The Fifth Engineering Co., Ltd. of China Railway First Group, Baoji 721006, Shaanxi, China)

Received date: 2012-09-28

  Revised date: 2012-10-15

  Online published: 2013-02-19

Abstract

If the surrounding rocks of asymmetricalloaded and shallowburied tunnel are weathered, collapse often occurs. It is difficult to reserve deformation. The deformation of primary support is large. The 6step CD method, 3step primary invert method, temporary support strengthening method and backfilling method are adopted in the construction of the entrances of Jinlingtou tunnel and Tongyou tunnel on BeijingFuzhou railway. The deformations of surrounding rocks and primary supports are brought under effective control and the safety of the shield passing throught dangerous section is guaranteed. 

Cite this article

LIU Jun . Construction Technologies for Asymmetricalloaded and Shallowburied  Tunnels with Soft Surrounding Rocks[J]. Tunnel Construction, 2012 , 32(增刊1) : 102 -104 . DOI: 10.3973/j.issn.1672-741X.2012.z1.022

Outlines

/

〈 〉