Construction Technologies of Baiguowan Tunnel Crossing underneath DazhouChengdu Railway
Received date: 2012-07-30
Revised date: 2012-08-20
Online published: 2013-02-19
The Baiguowan tunnel crosses underneath DazhouChengdu No. 2 line. The construction technologies, including existing railway reinforced by D beam, advance large roof support in tunnel, tiny step and temporary invert method, blasting control method and lining followed method, are used, so as to ensure the construction safety of Baiguowan tunnel and running existing railway. The paper can provide references for similar projects in the future.
ZHOU Tiegang . Construction Technologies of Baiguowan Tunnel Crossing underneath DazhouChengdu Railway[J]. Tunnel Construction, 2012 , 32(增刊1) : 113 -116 . DOI: 10.3973/j.issn.1672-741X.2012.z1.025
/
| 〈 |
|
〉 |