ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2012, Vol. 32 ›› Issue (增刊1): 113-116.DOI: 10.3973/j.issn.1672-741X.2012.z1.025
Previous Articles Next Articles
ZHOU Tiegang
Received:
Revised:
Online:
Published:
Abstract:
The Baiguowan tunnel crosses underneath DazhouChengdu No. 2 line. The construction technologies, including existing railway reinforced by D beam, advance large roof support in tunnel, tiny step and temporary invert method, blasting control method and lining followed method, are used, so as to ensure the construction safety of Baiguowan tunnel and running existing railway. The paper can provide references for similar projects in the future.
Key words: crossing underneath railway, existing railway line reinforcement, blasting control, lining
ZHOU Tiegang. Construction Technologies of Baiguowan Tunnel Crossing underneath DazhouChengdu Railway[J]. Tunnel Construction, 2012, 32(增刊1): 113-116.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2012.z1.025
http://www.suidaojs.com/EN/Y2012/V32/I增刊1/113