Grouting Consolidation Technologies for Disassembling Jammed TBM Cutter Head in Waterrich and Silty Sand Stratum

  • GE Zhaihui
Expand
  • (Technology Centre of China Railway Tunnel Group Co., Ltd., Luoyang 471009, Henan, China)

Received date: 2012-08-16

  Revised date: 2012-11-20

  Online published: 2013-02-19

Abstract

The TBM often jammed due to the overlarge thrusting force and torque induced by collapse of working face and overlarge mucking during TBM boring in waterrich and silty sand stratum. The ground ahead of cutter head is grouting consolidated, so as to successfully disassembling the jammed TBM. The watercontaining rate of the ground is reduced, the stability of the ground is improved and the successful and safe disassembling of cutter head is guaranteed.

Cite this article

GE Zhaihui . Grouting Consolidation Technologies for Disassembling Jammed TBM Cutter Head in Waterrich and Silty Sand Stratum[J]. Tunnel Construction, 2012 , 32(增刊2) : 105 -110 . DOI: 10.3973/j.issn.1672-741X.2012.z2.021

Outlines

/

〈 〉