ISSN 2096-4498

   CN 44-1745/U

二维码

Combination of Metro Works and Property: Case Study on Wuhan Metro

  • HU Zhe
Expand
  • (China Railway Tunnel Survey & Design Institute Co., Ltd., Tianjin 300133, China)

Received date: 2013-01-28

  Revised date: 2013-02-20

  Online published: 2013-04-12

Abstract

The combination of Metro works and property under different alignments, different stations, different surrounding environments and different boundary conditions are discussed. Points to which attention should be paid in the combination of Metro works and property are proposed. The paper can provide reference for the designer and manager of Metro works in adopting rational combination modes for Metro works and property and is helpful for the sustainable development of the combination of Metro works and property. 

Cite this article

HU Zhe . Combination of Metro Works and Property: Case Study on Wuhan Metro[J]. Tunnel Construction, 2013 , 33(4) : 295 -299 . DOI: 10.3973/j.issn.1672-741X.2013.04.007

Outlines

/

〈 〉