ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2013, Vol. 33 ›› Issue (4): 295-299.DOI: 10.3973/j.issn.1672-741X.2013.04.007

Previous Articles     Next Articles

Combination of Metro Works and Property: Case Study on Wuhan Metro

HU Zhe   

  1. (China Railway Tunnel Survey & Design Institute Co., Ltd., Tianjin 300133, China)
  • Received:2013-01-28 Revised:2013-02-20 Online:2013-04-20 Published:2013-04-12

Abstract:

The combination of Metro works and property under different alignments, different stations, different surrounding environments and different boundary conditions are discussed. Points to which attention should be paid in the combination of Metro works and property are proposed. The paper can provide reference for the designer and manager of Metro works in adopting rational combination modes for Metro works and property and is helpful for the sustainable development of the combination of Metro works and property. 

Key words: Wuhan Metro, combination of Metro works and property, city development, planning, fire fighting