ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2013, Vol. 33 ›› Issue (4): 295-299.DOI: 10.3973/j.issn.1672-741X.2013.04.007
Previous Articles Next Articles
HU Zhe
Received:
Revised:
Online:
Published:
Abstract:
The combination of Metro works and property under different alignments, different stations, different surrounding environments and different boundary conditions are discussed. Points to which attention should be paid in the combination of Metro works and property are proposed. The paper can provide reference for the designer and manager of Metro works in adopting rational combination modes for Metro works and property and is helpful for the sustainable development of the combination of Metro works and property.
Key words: Wuhan Metro, combination of Metro works and property, city development, planning, fire fighting
HU Zhe. Combination of Metro Works and Property: Case Study on Wuhan Metro[J]. Tunnel Construction, 2013, 33(4): 295-299.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2013.04.007
http://www.suidaojs.com/EN/Y2013/V33/I4/295