Analysis on and Control of Ground Surface Settlement: Case Study on Jiefangdalu Station of Line 1 of Changchun Metro Constructed by Topdown Construction Method under Protection of Castinsitu Arch
Received date: 2013-11-12
Revised date: 2014-01-09
Online published: 2014-03-20
Jiefangdalu station is an interchange station between Line 1 and Line 2 of Changchun Metro. The station is constructed by topdown construction method under the protection of castinsitu arch. The excavation sequence of the pilot tunnels is optimized so as to shorten the construction period and facilitate the construction organization. The ground surface settlement data of the station is analyzed and the pattern of the ground surface settlement of stations in Northeast China constructed by topdown construction method under the protection of castinsitu arch is obtained. The causes for the ground surface settlement are analyzed in terms of ground conditions, construction techniques and construction process. Countermeasures, including grouting reinforcement, proper pilot tunnel construction sequence and proper support dismantling, are proposed so as to control the ground surface settlement.
LI Chunkui . Analysis on and Control of Ground Surface Settlement: Case Study on Jiefangdalu Station of Line 1 of Changchun Metro Constructed by Topdown Construction Method under Protection of Castinsitu Arch[J]. Tunnel Construction, 2014 , 34(3) : 264 -268 . DOI: 10.3973/j.issn.1672-741X.2014.03.014
/
| 〈 |
|
〉 |