Analysis on and Control of Ground Surface Settlement: Case Study on Jiefangdalu Station of Line 1 of Changchun Metro Constructed by Topdown Construction Method under Protection of Castinsitu Arch
LI Chunkui
(China Railway 18th Bureau Group Co., Ltd., Tianjin 300202, China)
LI Chunkui. Analysis on and Control of Ground Surface Settlement: Case Study on Jiefangdalu Station of Line 1 of Changchun Metro Constructed by Topdown Construction Method under Protection of Castinsitu Arch[J]. Tunnel Construction, 2014, 34(3): 264-268.