ISSN 2096-4498

   CN 44-1745/U

二维码

Treatment of Water Leakage and Freezing of an Operating Railway Tunnel on Ji’ningBaotou Railway in Plateau and Extremely Cold Region

  • PAN Honggui ,
  • WANG Zhijie ,
  • LI Bo ,
  • XU Caizhang ,
  • QIU Yue ,
  • GAO Fei
Expand
  • (1. The Second Engineering Co., Ltd. of CTCE Group, Suzhou 215131, Jiangsu, China;  2. Southwest Jiaotong University, Chengdu 610031, Sichuan, China;  3. The 1st Engineering Co., Ltd. of CREC Shanghai, Wuhu 241000, Anhui, China)

Received date: 2014-01-26

  Revised date: 2014-04-26

  Online published: 2014-07-16

Abstract

An operating tunnel on Ji’ningBaotou railway in Inner Mongolia has water leakage defect. In the paper, a brief introduction is made to the tunnel, the water leakage defect and the freezing defect of the tunnel are expounded in terms of defect classification, defect causes, defect treatment methods and defect treatment effect. Comprehensive defect treatment measures, including grouting and heating and thermal insulation measures, are taken for the tunnel. The engineering practice shows that the treatment technologies adopted have achieved good construction progress, good economy and good effect in the treatment of the water leakage in plateau and extremely cold region.

Cite this article

PAN Honggui , WANG Zhijie , LI Bo , XU Caizhang , QIU Yue , GAO Fei . Treatment of Water Leakage and Freezing of an Operating Railway Tunnel on Ji’ningBaotou Railway in Plateau and Extremely Cold Region[J]. Tunnel Construction, 2014 , 34(7) : 696 -702 . DOI: 10.3973/j.issn.1672-741X.2014.07.017

Outlines

/

〈 〉