Shield Launching Technology for Running Tunnel on Smallradius Curve with One Single Shaft: Case Study on Line 2 of Dalian Metro

  • JI Weiguo
Expand
  • (Jinan Railway Engineering Co., Ltd., China Railway 10th Bureau Group, Jinan 250001, Shandong, China)

Received date: 2013-01-20

  Revised date: 2014-06-13

  Online published: 2014-09-22

Abstract

The running tunnel from Xi’an Road Station to Jiaotong University Station on Line 2 of Dalian Metro is on smallradius curves. The shield for the mentioned running tunnel is to be launched under the condition of one single shaft. In the paper, comparison and contrast is made between separate shield launching program and integral shield launching program in terms of progress, cost and feasibility, and it is finally determined that integral shield launching program is to be adopted. In the launching of the shield, selfmade belt conveyor and selfmade segment feeder are used, and the launching direction and the driving attitude of the shield are well controlled, so as to facilitate the mucking, segment delivery and shield attitude control in the launching. In the end, successful shield launching is achieved for the running tunnel on smallradius curves.

Cite this article

JI Weiguo . Shield Launching Technology for Running Tunnel on Smallradius Curve with One Single Shaft: Case Study on Line 2 of Dalian Metro[J]. Tunnel Construction, 2014 , 34(9) : 895 -899 . DOI: 10.3973/j.issn.1672-741X.2014.09.012