Experience in Management of Construction Progress of Civil Works of Metro Project under BT Mode

  • ZHAO Xiaohua ,
  • LIU Yang ,
  • CUI Genqun
Expand
  • (China Railway North Investment and Development Co.,Ltd., Shijiazhuang 050011, Hebei, China)

Received date: 2015-04-20

  Revised date: 2015-06-05

  Online published: 2015-08-17

Abstract

The following measures are taken to speed up the construction progress of the civil works of Line 1 of Shijiazhuang Metro, which is constructed under BT mode: determining the appropriate target dates of the milestones of the construction and the targets of the construction progress; paying adequate attention to the execution of the preliminary works; promoting the ontime commencement of works of each site; implementing strict control of the sites on the critical path; strengthening the management of the construction companies with their construction schedule lagging behind the targets; performing early warning during the construction; implementing target date examination, special examination and incentive program; ensuring the target dates of station construction, shield boring, tunnel breakthrough, track construction and electrical power supply system installation; optimizing the technological schemes; strengthening the safety and quality control; implementing good cooperation with the designer; ensuring the intime material supply; and helping the government authorities and the Client solve their problems. In the paper, the experience in the construction progress management is presented. 

Cite this article

ZHAO Xiaohua , LIU Yang , CUI Genqun . Experience in Management of Construction Progress of Civil Works of Metro Project under BT Mode[J]. Tunnel Construction, 2015 , 35(S1) : 5 -10 . DOI: 10.3973/j.issn.1672-741X.2015.S1.002

Outlines

/

〈 〉