Tunnel Construction ›› 2015, Vol. 35 ›› Issue (S1): 5-10.DOI: 10.3973/j.issn.1672-741X.2015.S1.002
Previous Articles Next Articles
ZHAO Xiaohua, LIU Yang, CUI Genqun
Received:
Revised:
Online:
Published:
Abstract:
The following measures are taken to speed up the construction progress of the civil works of Line 1 of Shijiazhuang Metro, which is constructed under BT mode: determining the appropriate target dates of the milestones of the construction and the targets of the construction progress; paying adequate attention to the execution of the preliminary works; promoting the ontime commencement of works of each site; implementing strict control of the sites on the critical path; strengthening the management of the construction companies with their construction schedule lagging behind the targets; performing early warning during the construction; implementing target date examination, special examination and incentive program; ensuring the target dates of station construction, shield boring, tunnel breakthrough, track construction and electrical power supply system installation; optimizing the technological schemes; strengthening the safety and quality control; implementing good cooperation with the designer; ensuring the intime material supply; and helping the government authorities and the Client solve their problems. In the paper, the experience in the construction progress management is presented.
Key words: BT mode, Shijiazhuang Metro, construction progress management
CLC Number:
U 455.1
ZHAO Xiaohua, LIU Yang, CUI Genqun. Experience in Management of Construction Progress of Civil Works of Metro Project under BT Mode[J]. Tunnel Construction, 2015, 35(S1): 5-10.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2015.S1.002
http://www.suidaojs.com/EN/Y2015/V35/IS1/5