ISSN 2096-4498

   CN 44-1745/U

二维码

Analysis on Ground Surface Settlement Caused by Shield Tunneling: Case Study on Line 1 of Shijiazhuang Metro

  • YANG Sanlong ,
  • WANG Haijiang
Expand
  • (The Third Engineering Co., Ltd. of China Railway Seventh Group, Xi’an 710032, Shaanxi, China)

Received date: 2015-05-22

  Revised date: 2015-06-02

  Online published: 2015-08-17

Abstract

Ground surface settlement is one of the most important parameters that should be well controlled in shield tunneling. During the construction of Line 1 of Shijiazhuang Metro, the settlement on some specific days reaches the alert value, however, the accumulated settlement value does not reach the alert value, although the shield boring parameters meet the design requirements. In the paper, the causes for the ground surface settlement are analyzed in terms of excavation chamber pressure, simultaneous grouting, grout performance and ground stability, with the data of the running tunnel from Stadium station to Beisong station measured on June 15, 2014 as examples. Finally, the ground settlement under the fine silt sand strata, finemedium sand strata and mediumcoarse sand strata in Shijiazhuang are analyzed. 

Cite this article

YANG Sanlong , WANG Haijiang . Analysis on Ground Surface Settlement Caused by Shield Tunneling: Case Study on Line 1 of Shijiazhuang Metro[J]. Tunnel Construction, 2015 , 35(S1) : 41 -47 . DOI: 10.3973/j.issn.1672-741X.2015.S1.009

Outlines

/

〈 〉