Received date: 2015-05-29
Revised date: 2015-07-20
Online published: 2015-12-24
In this paper, the site quality control of integrated grounding management of CheHong section on No. 11 Line of Shenzhen Metro is studied, in terms of material control ,construction technology, labor capacity, equipment, construction environment and acceptance program. The paper can provide reference for the grounding management of Metro in the future.
LV Xuedong . Construction of Metro Integrated Grounding System[J]. Tunnel Construction, 2015 , 35(S2) : 86 -90 . DOI: 10.3973/j.issn.1672-741X.2015.S2.015
/
| 〈 |
|
〉 |