ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2015, Vol. 35 ›› Issue (S2): 86-90.DOI: 10.3973/j.issn.1672-741X.2015.S2.015

Previous Articles     Next Articles

Construction of Metro Integrated Grounding System

LV Xuedong   

  1. (Electromechanical Engineering Co., Ltd., China Railway Tunnel Group, Luoyang 471009, Henan, China)
  • Received:2015-05-29 Revised:2015-07-20 Online:2015-12-15 Published:2015-12-24

Abstract:

In this paper, the site quality control of integrated grounding management of CheHong section on No. 11 Line of Shenzhen Metro is studied, in terms of material control ,construction technology, labor capacity, equipment, construction environment and acceptance program. The paper can provide reference for the grounding management of Metro in the future. 

Key words: Shenzhen Metro, integrated grounding, horizontal grounding body, vertical grounding body, drag reducer

CLC Number: