ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2015, Vol. 35 ›› Issue (S2): 86-90.DOI: 10.3973/j.issn.1672-741X.2015.S2.015
Previous Articles Next Articles
LV Xuedong
Received:
Revised:
Online:
Published:
Abstract:
In this paper, the site quality control of integrated grounding management of CheHong section on No. 11 Line of Shenzhen Metro is studied, in terms of material control ,construction technology, labor capacity, equipment, construction environment and acceptance program. The paper can provide reference for the grounding management of Metro in the future.
Key words: Shenzhen Metro, integrated grounding, horizontal grounding body, vertical grounding body, drag reducer
CLC Number:
U 45
LV Xuedong. Construction of Metro Integrated Grounding System[J]. Tunnel Construction, 2015, 35(S2): 86-90.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2015.S2.015
http://www.suidaojs.com/EN/Y2015/V35/IS2/86