Transfer Scheme with No Roreserved Node:  A Case Study on Chegongzhuang Station of Beijing Metro

  • SHUAI Liumei ,
  • LI Guoqing
Expand
  • (China Railway Survey and Design Institute Co., Ltd., Tianjin 300133, China)

Received date: 2015-08-13

  Revised date: 2015-10-16

  Online published: 2016-02-01

Abstract

In this paper, the transfer scheme between Chegongzhuang Station of Beijing Metro and existing Metro station with no reserved transfer node is proposed. The transfer modes, i.e. crossshaped and Tshaped transfer modes, are summarized. It proves that the Tshaped transfer mode with 3 transfer galleries is optimum for a new Metro station undercrossing existing Metro station.

Cite this article

SHUAI Liumei , LI Guoqing . Transfer Scheme with No Roreserved Node:  A Case Study on Chegongzhuang Station of Beijing Metro[J]. Tunnel Construction, 2016 , 36(1) : 66 -70 . DOI: 10.3973/j.issn.1672-741X.2016.01.010