ISSN 2096-4498
CN 44-1745/U
ISSN 2096-4498
CN 44-1745/U
Applicability Analysis on and Suggestions for Design Construction Methods for Surrounding Rocks: A Case Study on DongguanHuizhou Intercity Railway Tunnel Constructed by Mining Method
Received date: 2014-12-21
Revised date: 2015-03-20
Online published: 2016-03-02
The construction procedure, construction method, stability and advantages and disadvantages of different grades of surrounding rocks are analyzed. The analytical results show that the design construction methods of Songshanhu underground tunnel on DongguanHuizhou intercity railway are not so feasible. So some suggestions are proposed as follows: 1) For Grade Ⅵ surrounding rocks, threebench sevenstep method + arch temporary column support method is feasible for No. 4, No. 5 and No. 6 surrounding rocks; and threebench sevenstep method is feasible for No. 7 and No. 8 surrounding rocks. 2) For Grade Ⅴ surrounding rocks, temporary invert bench method or top heading and benching method is feasible for No. 2 surrounding rock; and top heading and bench method is feasible for No. 3, No. 4 and No. 5 surrounding rocks. 3) For Grade Ⅳ surrounding rocks, top heading and bench method is feasible.
NIE Zhenyu . Applicability Analysis on and Suggestions for Design Construction Methods for Surrounding Rocks: A Case Study on DongguanHuizhou Intercity Railway Tunnel Constructed by Mining Method[J]. Tunnel Construction, 2016 , 36(2) : 193 -199 . DOI: 10.3973/j.issn.1672-741X.2016.02.011
/
| 〈 |
|
〉 |