ISSN 2096-4498

   CN 44-1745/U

二维码

Treating Principle of and Countermeasures for Collapsible Loess: Case Study on Lintong Line of Xi’an Metro

  • LUO Zhangbo
Expand
  • (China Railway Fifth Survey and Design Institute Group Co., Ltd., Beijing 102600, China)

Received date: 2015-08-03

  Revised date: 2015-10-08

  Online published: 2016-03-30

Abstract

Part of the Metro stations and tunnel sections on Lintong Line of Xi’an Metro cross dead weight collapsible loess. In this paper, the stressing conditions and probability of environmental change of foundation of Metro projects are analyzed and studied. And then the treating principle of and countermeasures for collapsible loess are proposed. The collapsible probability of Lintong Line of Xi’an Metro is estimated; the collapsible deformation of the loess and structural stress are calculated; the stress deformation and stressstrain characteristics of the structure at different connection points of Metro projects are analyzed. Finally, some countermeasures for collapsible loess of Metro tunnel, mined tunnel and shield tunnel are proposed. The resalts can provide reference for the design and construction of Xi’an Metro and other similar projects.

Cite this article

LUO Zhangbo . Treating Principle of and Countermeasures for Collapsible Loess: Case Study on Lintong Line of Xi’an Metro[J]. Tunnel Construction, 2016 , 36(3) : 257 -263 . DOI: 10.3973/j.issn.1672-741X.2016.03.002

Outlines

/

〈 〉