Key Technologies for Deep Superlong Water Diversion Tunnels: A Case Study of KaShuang Tunnel
Received date: 2015-12-28
Revised date: 2016-04-11
Online published: 2016-06-29
The main geological problems of KaShuang deep superlong water diversion tunnel are analyzed. The key technologies for rapid boring and safety control of superlong tunnel TBM construction are proposed in terms of alignment arrangement, applicability design of TBM and matching system, construction of main tunnel and branch tunnel, construction risk control and complex management of TBM group construction. The geological conditions investigated illustrate that there is no geological risk. The deep and long inclined shaft and deep intermeadiate vertical shaft are needed due to the complanate landform; and further study and feasible technologies are needed as well.
Key words: water diversion tunnel; engineering geology; TBM; rapid thrusting; safety control
DENG Mingjiang , ZHOU Xiaobing , CUI Dong , MA Yong , LI Wenxin , XU Mingxin . Key Technologies for Deep Superlong Water Diversion Tunnels: A Case Study of KaShuang Tunnel[J]. Tunnel Construction, 2016 , 36(6) : 666 -675 . DOI: 10.3973/j.issn.1672-741X.2016.06.003
/
| 〈 |
|
〉 |