ISSN 2096-4498

   CN 44-1745/U

二维码

Visualized Monitoring Technology for Segment Sinking and Installation  of Honggu Tunnel in Nanchang

  • ZHANG Wei ,
  • ZHANG Yi ,
  • LI Zhijun
Expand
  • (1. China Railway Tunnel Survey & Design Institute Co., Ltd., Tianjin 300133, China;  2. Guangzhou Salvage Bureau, Guangzhou 510260, Guangdong, China;  3. Erchu Co., Ltd. of China Railway Tunnel Group, Sanhe 065201, Hebei, China)

Received date: 2016-05-10

  Revised date: 2016-06-25

  Online published: 2016-09-20

Abstract

A visualized monitoring system is used in segment installation of Honggu Tunnel in Nanchang, so as to guarantee the segment installation precision and rapid construction. A visualized model is established according to data collection and process based on total station and GPS. The comparison results between measured data and theoretical calculation ones show that the visualized monitoring system is highefficient and can meet the segment installation precision and speed up the segment installation of immersed tunnel.

Cite this article

ZHANG Wei , ZHANG Yi , LI Zhijun . Visualized Monitoring Technology for Segment Sinking and Installation  of Honggu Tunnel in Nanchang[J]. Tunnel Construction, 2016 , 36(9) : 1120 -1124 . DOI: 10.3973/j.issn.1672-741X.2016.09.014

Outlines

/

〈 〉