Visualized Monitoring Technology for Segment Sinking and Installation  of Honggu Tunnel in Nanchang

ZHANG Wei1, ZHANG Yi2, LI Zhijun3   

  1. (1. China Railway Tunnel Survey & Design Institute Co., Ltd., Tianjin 300133, China;  2. Guangzhou Salvage Bureau, Guangzhou 510260, Guangdong, China;  3. Erchu Co., Ltd. of China Railway Tunnel Group, Sanhe 065201, Hebei, China)
  • Received:2016-05-10 Revised:2016-06-25 Online:2016-09-20 Published:2016-09-20

Abstract:

A visualized monitoring system is used in segment installation of Honggu Tunnel in Nanchang, so as to guarantee the segment installation precision and rapid construction. A visualized model is established according to data collection and process based on total station and GPS. The comparison results between measured data and theoretical calculation ones show that the visualized monitoring system is highefficient and can meet the segment installation precision and speed up the segment installation of immersed tunnel.

Key words: Honggu Tunnel, immersed tunnel, segment sinking, segment installation, visualized monitoring