ISSN 2096-4498

   CN 44-1745/U

二维码

Comparison between Bench Method and Fullface Method for  Ping’an Soft Rock Tunnel on ChengduLanzhou Railway

  • XIAN Guo
Expand
  • (ChengduLanzhou Railway Co., Ltd., Chengdu 610036, Sichuan, China)

Received date: 2016-07-08

  Revised date: 2016-11-03

  Online published: 2016-11-30

Abstract

Comparison between bench method and fullface method (including invert arch) for soft rock section of Ping’an Tunnel on ChengduLanzhou Railway is made in terms of surrounding rock deformation, primary support stress and construction organization by using numerical simulation, theoretical calculation and site test. The study results show that: 1) The stability of surrounding rock of tunnel constructed by bench method is superior to that constructed by fullface method; and the accumulated deformation of tunnel constructed by fullface method is smaller than that constructed by bench method. 2) The sizes of shear zone and tensile failure zone of tunnel constructed by 2 methods are almost the same. The construction quality of tunnel constructed by fullface method is easier to control. 3) The fullface method is superior to bench method in terms of labor and construction schedule.

Cite this article

XIAN Guo . Comparison between Bench Method and Fullface Method for  Ping’an Soft Rock Tunnel on ChengduLanzhou Railway[J]. Tunnel Construction, 2016 , 36(11) : 1302 -1309 . DOI: 10.3973/j.issn.1672-741X.2016.11.003

Outlines

/

〈 〉