ISSN 2096-4498

   CN 44-1745/U

二维码

Design of Drainage System of Metro Floor of Yangtze Rivercrossing HighwayMetro Integrated Tunnel on Sanyang Road in Wuhan

  • LIU Jian
Expand
  • (China Railway Siyuan Survey and Design Group Co., Ltd., Wuhan 430063, Hubei, China)

Received date: 2016-07-26

  Revised date: 2016-11-10

  Online published: 2017-01-24

Abstract

The layout of wastewater pump room of rivercrossing highway and Metro integrated tunnel directly affects the engineering investment and operation safety. The wastewater pump room of highway tunnel and that of Metro tunnel of Yangtze Rivercrossing highway and Metro integrated tunnel are set separately. The layout schemes of wastewater pump room, i.e. pump room outside tunnel, pump room with submersible pump inside tunnel and pump room with lobe pump inside tunnel, are proposed and comprehensively compared in terms of civil engineering influence, pump type selection, inspection and maintenance and safety. The layout scheme of pump room with lobe pump inside tunnel is selected. The 3 collecting basins are set on side of and in the middle of railway; and the lobe pump is taken as Grade 1 pump on Grade 1 pump room. The adopted scheme can reduce the drop depth of sinking collecting basin and the influence on segment, improve the safety and make the daily inspection and maintenance of pump more convenient.

Cite this article

LIU Jian . Design of Drainage System of Metro Floor of Yangtze Rivercrossing HighwayMetro Integrated Tunnel on Sanyang Road in Wuhan[J]. Tunnel Construction, 2017 , 37(1) : 81 -85 . DOI: 10.3973/j.issn.1672-741X.2017.01.013

Outlines

/

〈 〉