Special Survey and Analysis of Boulders and Pebbles of Shield Tunnel of Phase Ⅱ of Chengdu Metro Line No. 4

  • GUI Jinxiang ,
  • LI Jianqiang ,
  • WANG Jialiang
Expand
  • (China Railway Eryuan Engineering Group Co., Ltd., Chengdu 610031, Sichuan, China)

Received date: 2016-11-01

  Revised date: 2016-12-30

  Online published: 2017-04-28

Abstract

In order to learn the distribution, content, diameter and strength of boulders and machine tool coefficient, nature intensity and hydrogeological characteristics of boulders and pebbles met on west extended section of Phase Ⅱ of Chengdu Metro Line No. 4, a series of methods, i.e. insitu well group dewatering, manual excavation of largediameter exploratory well, reinforced concrete retaining wall, underground geological compilation and measuring, site K30 test, intensity tests, sampling and hydrogeological tests of boulders, are carried out. The construction method selection, tunnel buried depth and shield type selection are analyzed; the potential geotechnical issues occuring during shield tunneling are predicted. Finally, some countermeasures and surveying method for boulders and pebbles are suggested.

Cite this article

GUI Jinxiang , LI Jianqiang , WANG Jialiang . Special Survey and Analysis of Boulders and Pebbles of Shield Tunnel of Phase Ⅱ of Chengdu Metro Line No. 4[J]. Tunnel Construction, 2017 , 37(4) : 476 -485 . DOI: 10.3973/j.issn.1672-741X.2017.04.014

Outlines

/

〈 〉