Key Construction Technologies for Zhongtiaoshan Tunnel on Menghua Railway
Received date: 2017-07-14
Revised date: 2017-09-20
Online published: 2018-01-04
During the construction of Zhongtiaoshan Tunnel on Menghua Railway, a series of problems, i.e. soft and weak and weathered surrounding rock, inadequate bearing capacity of inverted arch base, rich water of sandycobble load bearing strata of inclined shaft and large volume of water inrush of tunnel, were encountered. Key technologies, i.e. rapid closed ring by microbench of soft and weak surrounding rock with onetime inverted arch excavation, largesection filling of inverted arch of secondary lining and inverted arch of singleline railway tunnel, spall filling and reinforcement of inverted arch base and drainage pipe set in inverted arch base (including sectioned water stop and reverseslope drainage technology), are introduced. Some conclusions are drawn as follows: 1) The secondary disturbance of surrounding rock can be reduced and the surrounding convergence and crown top settlement can be effectively controlled by onetime blasting and shaped of inverted arch and lower bench. 2) The connecting time of construction joints between inverted arches can be reduced and the integrity of inverted arch can be improved by 24 mlong hydraulic crawlertype trestle. 3) The water stop effect of watercontained soft rock section can be improved by spall filling and grouting reinforcement. 4) The water drainage volume of reserve slopeface excavation can be reduced and the construction schedule of excavation face can be shortened by sectioned water stopping technology.
CHEN Hong , YIN Xiaodong , LI Yong . Key Construction Technologies for Zhongtiaoshan Tunnel on Menghua Railway[J]. Tunnel Construction, 2017 , 37(12) : 1585 -1592 . DOI: 10.3973/j.issn.2096-4498.2017.12.012
/
| 〈 |
|
〉 |