ISSN 2096-4498
CN 44-1745/U

Tunnel Construction ›› 2017, Vol. 37 ›› Issue (12): 1585-1592.DOI: 10.3973/j.issn.2096-4498.2017.12.012
Previous Articles Next Articles
CHEN Hong1, YIN Xiaodong1, LI Yong2
Received:
2017-07-14
Revised:
2017-09-20
Online:
2017-12-20
Published:
2018-01-04
CLC Number:
CHEN Hong, YIN Xiaodong, LI Yong. Key Construction Technologies for Zhongtiaoshan Tunnel on Menghua Railway[J]. Tunnel Construction, 2017, 37(12): 1585-1592.
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.2096-4498.2017.12.012
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||
Support by Beijing Magtech Co.ltd support@magtech.com.cn