ISSN 2096-4498

   CN 44-1745/U

二维码

Study of Tunnel Controlled Blasting Technology and Blastinduced Damage Zone of Surrounding Rocks

  • YIN Wengang ,
  • WANG Hailiang ,
  • HU Hongxing ,
  • ZHANG Fuqiang ,
  • CHEN Jihui
Expand
  • (1. China Railway No.3 Engineering Group Co., Ltd., Taiyuan 030000, Shanxi, China; 2. Key Laboratory of Mine Disaster Prevention and Control, Shandong University of Science & Technology, Qingdao 266590, Shandong, China)

Received date: 2017-11-24

  Revised date: 2018-01-07

  Online published: 2018-06-01

Abstract

In order to solve the problem of overbreak/underbreak of surrounding rock of Wawuzhuang StationGuizhoulu Station Section on Qingdao Metro Line No. 1 induced by drilling accuracy of surrounding blasting holes enslaved to grid steel frame of primary support, the controlled blasting technology of long and short blasting holes is introduced; and then the layout scheme of long and short blasting holes is proposed. Meanwhile, the damage zone of surrounding rock and tunnel overbreak/underbreak amount induced by blasting are analyzed and monitored by particle peak vibration method and tunnel crosssection laser detector, respectively. The results show that: (1) The tunnel overbreak/underbreak amount in Grade Ⅳ surrounding rock section can be controlled within 150 mm; and the shotcrete cost per meter can be decreased by RMB 7 182 by adopting long and short blasting holes. (2) The damage zone of surrounding rock induced by controlled blasting technology of long and short holes ranges from 0.29 m to 0.33 m; and the tunnel crown top settlement and clearance convergence are both less than 10 mm. Good economic benefit and construction effect have been achieved.

Cite this article

YIN Wengang , WANG Hailiang , HU Hongxing , ZHANG Fuqiang , CHEN Jihui . Study of Tunnel Controlled Blasting Technology and Blastinduced Damage Zone of Surrounding Rocks[J]. Tunnel Construction, 2018 , 38(5) : 851 -856 . DOI: 10.3973/j.issn.2096-4498.2018.05.020

Outlines

/

〈 〉