Tunnel Construction ›› 2018, Vol. 38 ›› Issue (5): 851-856.DOI: 10.3973/j.issn.2096-4498.2018.05.020

Previous Articles     Next Articles

Study of Tunnel Controlled Blasting Technology and Blastinduced Damage Zone of Surrounding Rocks

YIN Wengang1, WANG Hailiang2, *, HU Hongxing1, ZHANG Fuqiang1, CHEN Jihui2   

  1. (1. China Railway No.3 Engineering Group Co., Ltd., Taiyuan 030000, Shanxi, China; 2. Key Laboratory of Mine Disaster Prevention and Control, Shandong University of Science & Technology, Qingdao 266590, Shandong, China)
  • Received:2017-11-24 Revised:2018-01-07 Online:2018-05-20 Published:2018-06-01

Abstract:

In order to solve the problem of overbreak/underbreak of surrounding rock of Wawuzhuang StationGuizhoulu Station Section on Qingdao Metro Line No. 1 induced by drilling accuracy of surrounding blasting holes enslaved to grid steel frame of primary support, the controlled blasting technology of long and short blasting holes is introduced; and then the layout scheme of long and short blasting holes is proposed. Meanwhile, the damage zone of surrounding rock and tunnel overbreak/underbreak amount induced by blasting are analyzed and monitored by particle peak vibration method and tunnel crosssection laser detector, respectively. The results show that: (1) The tunnel overbreak/underbreak amount in Grade Ⅳ surrounding rock section can be controlled within 150 mm; and the shotcrete cost per meter can be decreased by RMB 7 182 by adopting long and short blasting holes. (2) The damage zone of surrounding rock induced by controlled blasting technology of long and short holes ranges from 0.29 m to 0.33 m; and the tunnel crown top settlement and clearance convergence are both less than 10 mm. Good economic benefit and construction effect have been achieved.

Key words: subsea tunnel, tunnel forming, controlled blasting technology of long and short blasting holes, overbreak/underbreak, surrounding rock damage, smooth blasting