Discussion on Largescale Mechanized Matching and Its Informatied Application to ZhengzhouWanzhou Highspeed Railway Tunnel Construction
Received date: 2018-04-24
Revised date: 2018-07-20
Online published: 2018-09-04
The drilling and blasting method for tunnel has many disadvantages such as low mechanization, bad construction environment and high labor intensity. Hence, the large crosssection construction technologies for Hubei Section on ZhengzhouWanzhou Highspeed Railway are summarized from the aspects of theoretical research, mechanized matching equipments, and construction technology and informatized system application. The technologies adopted include: (1) The construction idea of collapse load is changed into deformation control design. (2) The construction method of stepped excavation and bench method are changed into large crosssection and fullsection method. (3) The primary support and advance prereinforcement are strengthened by changing hollow grouting anchor bole by low prestressed expansion anchor bolt and using earlystrengthened shotcrete with high strength. (4) Multiboom rock drilling jumbo is adopted. (5) The single process mechanized construction is changed into whole process mechanized matching. (6) The information platform is established to carry out construction management. A series of technologies for safe, rapid and standardized large crosssection mechanized tunnel construction is obtained, which can promote the tunnel construction and management level.
LIN Yi , WANG Lijun , JIANG Jun . Discussion on Largescale Mechanized Matching and Its Informatied Application to ZhengzhouWanzhou Highspeed Railway Tunnel Construction[J]. Tunnel Construction, 2018 , 38(8) : 1361 -1370 . DOI: 10.3973/j.issn.2096-4498.2018.08.013
/
| 〈 |
|
〉 |