Study of Parameters of Grouting Circle for Deepditch Drainage Tunnel in Waterrich Karst Area
Received date: 2018-04-12
Revised date: 2018-06-26
Online published: 2018-12-02
In order to rationally determine the characteristic parameters of tunnel grouting circle under drainage mode of deep ditch, the rationality of the grouting circle parameters of a tunnel in waterrich karst area is discussed by a fluidsolid coupling calculation model based on software FLAC3D, and the influencing laws of thickness and permeability of grouting circle on water gushing volume, water pressure of lining structure and structural safety are studied. The study results show that: (1) The water pressure of lining and the water gushing volume can be reduced, and the structural safety can be guaranteed by rationally increasing the thickness of the grouting circle or reducing the permeability of the grouting circle. (2) According to the simulation results and similar projects, the thickness of grouting circle of 56 m and the permeability coefficient of 2×10-6 cm/s are recommended, respectively; and the grouting parameters should be rationally determined according to actual technoeconomic comparison results.
MA Qing , LUO Lusen , YANG Junsheng , ZHANG Zheng , LI Linyi . Study of Parameters of Grouting Circle for Deepditch Drainage Tunnel in Waterrich Karst Area[J]. Tunnel Construction, 2018 , 38(11) : 1793 -1799 . DOI: 10.3973/j.issn.2096-4498.2018.11.006
/
| 〈 |
|
〉 |