Realtime Force Monitoring Method for Disc Cutter in TBM Tunneling
Received date: 2018-07-19
Revised date: 2019-01-02
Online published: 2019-03-05
Due to the harsh tunnelling environment, it is difficult to carry out realtime force monitoring of tunnel boring machine (TBM) disc cutter. Hence, the characteristics of disc cutter components and the transferring law of load are analyzed, a strain gauge is embedded in cshaped cushion block, an effective monitoring method is proposed, and effectiveness and feasibility of the monitoring method are proved by the calibration test of the cshaped support block and the rotary rockbreaking test. The test results show that: (1) Under the condition of different penetration degrees, the vertical load obtained by the stress monitoring method is slightly different from that of the oil cylinder, and the variation trends of the stresses are almost the same, which indicates the feasibility and effectiveness of the monitoring method. (2) With the increase of penetration degree, the normal and lateral forces of the disc cutters increase.
WANG Shaohua , LIU Quansheng , HUANG Xing , ZHANG Xiaobo . Realtime Force Monitoring Method for Disc Cutter in TBM Tunneling[J]. Tunnel Construction, 2019 , 39(2) : 309 -316 . DOI: 10.3973/j.issn.2096-4498.2019.02.018
/
| 〈 |
|
〉 |