Mechanized Construction Technology for Large Crosssection Longchang Highway Tunnel in Grade Ⅳ Surrounding Rock

  • HUANG Weike ,
  • CHEN Jiabao ,
  • ZHANG Libin ,
  • MA Jianyun
Expand
  • (CCCCSHB Sixth Engineering Co., Ltd., Xi′an 710075, Shaanxi, China)

Online published: 2020-09-03

Abstract

The construction of highway tunnels in China is characterized by manual operation, low mechanization degree, long process cycle time, slow construction progress and high safety risk. Hence, large crosssection construction method is proposed for Longchang Tunnel on GuiyangHuangping Expressway based on Chinese standards and the design concept of NATM in Europe. The "9+N" equipments, i.e. tripleboom rock drilling jumbo, arch anchor installation trolley, etc. + multifunctional geological drilling machine and automatic grouting machine, etc.〖KG-*3〗, and corresponding construction technologies are adopted to carry out seamless tunnel construction. The results show that "9+N"construction technology recommended can reduce the labor consumption and impact on surrounding environment, improve the mechanization degree and construction efficiency, and guarantee the construction safety and quality.

Cite this article

HUANG Weike , CHEN Jiabao , ZHANG Libin , MA Jianyun .

Mechanized Construction Technology for Large Crosssection Longchang Highway Tunnel in Grade Ⅳ Surrounding Rock

[J]. Tunnel Construction, 2020 , 40(8) : 1203 -1210 . DOI: 10.3973/j.issn.2096-4498.2020.08.014